- Home
- Intelligence for Architects
- Subscribe
- Jobs
- Events
2025 events calendar Explore now Keep up to date
Find out more
- Programmes
- CPD
- More from navigation items
Document points to poor installation and incorrect materials used in tower’s refurbishment
A new report has outlined a catalogue of failings in the refurbishment of the Grenfell Tower where last summer 71 people died in the blaze which ripped through the 24-storey apartment block.
The 200-page document, a draft copy of which has been seen by the Evening Standard, was written by BRE Global, which independently certifies fire prevention products, and commissioned by the Metropolitan Police as part of its investigation into the deadly fire.
The leaked report, dated January 31, 2018, highlights failings around the refurbishment of the tower, which took place between 2014 and 2016, and areas where building regulations had been ignored.
You are not currently logged in.
Existing Subscriber? LOGIN
REGISTER for free access on selected stories and sign up for email alerts. You get:
Subscribe to Building Design and you will benefit from: