Leaked BRE report criticises refurb failures at Grenfell

Grendfell Tower the day after fire

Source: C. Hoyer / Shutterstock.com

Document points to poor installation and incorrect materials used in tower’s refurbishment

A new report has outlined a catalogue of failings in the refurbishment of the Grenfell Tower where last summer 71 people died in the blaze which ripped through the 24-storey apartment block.

The 200-page document, a draft copy of which has been seen by the Evening Standard, was written by BRE Global, which independently certifies fire prevention products, and commissioned by the Metropolitan Police as part of its investigation into the deadly fire.

The leaked report, dated January 31, 2018, highlights failings around the refurbishment of the tower, which took place between 2014 and 2016, and areas where building regulations had been ignored.

This content is available to registered users | Already registered?Login here

You are not currently logged in.

To continue reading this story, sign up for free guest access

Existing Subscriber? LOGIN

REGISTER for free access on selected stories and sign up for email alerts. You get:

  • Up to the minute architecture news from around the UK
  • Breaking, daily and weekly e-newsletters

 

Subscribe to Building Design and you will benefit from:

Gated access promo

  • Unlimited news
  • Reviews of the latest buildings from all corners of the world
  • Technical studies
  • Full access to all our online archives
  • PLUS you will receive a digital copy of WA100 worth over £45

Subscribe now for unlimited access.