Document points to poor installation and incorrect materials used in tower’s refurbishment

Grendfell Tower the day after fire

Source: C. Hoyer / Shutterstock.com

A new report has outlined a catalogue of failings in the refurbishment of the Grenfell Tower where last summer 71 people died in the blaze which ripped through the 24-storey apartment block.

The 200-page document, a draft copy of which has been seen by the Evening Standard, was written by BRE Global, which independently certifies fire prevention products, and commissioned by the Metropolitan Police as part of its investigation into the deadly fire.

The leaked report, dated January 31, 2018, highlights failings around the refurbishment of the tower, which took place between 2014 and 2016, and areas where building regulations had been ignored. The report goes into a new level of detail and the breadth of its focus suggests the final report will not limit itself to the now-infamous cladding.

It says the original construction would probably have contained any fire in the originating flat. The original facade of “exposed concrete and, given its age, likely timber or metal frame windows, would not have provided a medium for fire spread up the external surface,” it says

Cavity gaps which were supposed to expand and seal the void between the concrete surface of the building and cladding insulation fitted during the refurbishment were of “insufficient size specification”, it says.

Some cavity barriers were installed “upside down” or “back to front”, the report says, suggesting human error was to blame.

And window frames were reportedly “significantly narrower than the gap between the concrete surfaces of the columns, 150mm narrower”.

Resulting gaps were filled by a rubberised membrane, rigid foam insulation and uPVC lightweight plastic panels, with “none of the materials used capable of providing 30 minutes’ fire resistance”.

The report says this provided “a direct route for fire spread around the window frame into the cavity of the facade…and from the facade back into flats”.

It also found insulation used in the cladding was “combustible” and “provided a medium for fire spread up, across and within sections of the facade”.

BRE said the manufacturer of the 75mm insulation foam used on most of the spandrel beams was not stated on the material.

The aluminium composite used in the cladding had a polyethylene core which was highly combustible, while the report suggested many of the flats’ front doors did not have door closer mechanisms, meaning they remained open after residents fled their properties, exacerbating the spread of fire and smoke.

Last week the government announced the launch of a consultation to toughen up the regulations covering fire safety testing.

Communities secretary Sajid Javid said the consultation would look at restricting or banning the use of desktop studies as a way of assessing the fire performance of external cladding systems. 

The government has also asked whether desktop studies should be used at all.

The architect involved in the refurbishment was Studio E.